View Item 
  •   Unmul Repository Home
  • Articles
  • A - Teacher Training and Education
  • View Item
  •   Unmul Repository Home
  • Articles
  • A - Teacher Training and Education
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

ANALISIS PRODUKSI ENERGI SISTEM HIBRID PV/GENSET DI TPA BONTANG LESTARI

Thumbnail
View/Open
PRODUKSI ENERGI SISTEM HIBRID-(Mulawarman).pdf (470.6Kb)
Date
2011-10-15
Author
Ahsan, Siti Hamnah
Subagiyo, Lambang
Metadata
Show full item record
Abstract
In this paper, performances of PV/Genset hybrid system installed at TPA Bontang Lestari has been carried out based on energy production analysis using methodology from IEA PVPS task 2. The system performance during two months are : the average of solar radiation is rather potential about 6,43 kWh/m energy generate from PV about 34,43 kWh and the energy supply from Genset about 33,60 kWh. The 2 months average performance ratio of the whole system is 40.75%. and final yield is 2,34 hours/day. This potential of the system is comparably high to the potential range of PV hybrid system.
URI
http://repository.unmul.ac.id/handle/123456789/8672
Collections
  • A - Teacher Training and Education [735]

Repository Universitas Mulawarman copyright ©   LP3M Universitas Mulawarman
Jalan Kuaro Kotak Pos 1068
Telp. (0541) 741118
Fax. (0541) 747479 - 732870
Samarinda 75119, Kalimantan Timur, Indonesia
Contact Us | Send Feedback
 

 

Browse

All of Unmul RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Repository Universitas Mulawarman copyright ©   LP3M Universitas Mulawarman
Jalan Kuaro Kotak Pos 1068
Telp. (0541) 741118
Fax. (0541) 747479 - 732870
Samarinda 75119, Kalimantan Timur, Indonesia
Contact Us | Send Feedback