Show simple item record

dc.contributor.authorHamnah Ahsan, Siti
dc.contributor.authorSubagiyo, Lambang
dc.date.accessioned2022-06-15T06:34:25Z
dc.date.available2022-06-15T06:34:25Z
dc.date.issued2011-10
dc.identifier.issn1412-498X
dc.identifier.urihttp://repository.unmul.ac.id/handle/123456789/38207
dc.description.abstractIn this paper, performances of PV/Genset hybrid system installed at TPA Bontang Lestari has been carried out based on energy production analysis using methodology from IEA PVPS task 2. The system performance during two months are : the average of solar radiation is rather potential about 6,43 kWh/m2, The energy generate from PV about 34,43 kWh and the energy supply from Genset about 33,60 kWh. The 2 months average performance ratio of the whole system is 40.75%. and final yield is 2,34 hours/day. This potential of the system is comparably high to the potential range of PV hybrid system.en_US
dc.language.isootheren_US
dc.publisherMulawarman Scientifieen_US
dc.relation.ispartofseriesVolume 10, No. 2;163-172
dc.subjectPV/Genset hybrid system, energy production, system performanceen_US
dc.titleANALISIS PRODUKSI ENERGI SISTEM HIBRID PV/GENSET DI TPA BONTANG LESTARIen_US
dc.typeArticleen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record