Please use this identifier to cite or link to this item: http://repository.unmul.ac.id/handle/123456789/8672
Title: ANALISIS PRODUKSI ENERGI SISTEM HIBRID PV/GENSET DI TPA BONTANG LESTARI
Authors: Ahsan, Siti Hamnah
Subagiyo, Lambang
Keywords: PV/Genset hybrid system
energy production
system performance
Issue Date: 15-Oct-2011
Series/Report no.: Volume 10;Issue 2
Abstract: In this paper, performances of PV/Genset hybrid system installed at TPA Bontang Lestari has been carried out based on energy production analysis using methodology from IEA PVPS task 2. The system performance during two months are : the average of solar radiation is rather potential about 6,43 kWh/m energy generate from PV about 34,43 kWh and the energy supply from Genset about 33,60 kWh. The 2 months average performance ratio of the whole system is 40.75%. and final yield is 2,34 hours/day. This potential of the system is comparably high to the potential range of PV hybrid system.
URI: http://repository.unmul.ac.id/handle/123456789/8672
ISSN: 1412-498X
Appears in Collections:A - Teacher Training and Education

Files in This Item:
File Description SizeFormat 
PRODUKSI ENERGI SISTEM HIBRID-(Mulawarman).pdf470.6 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.