Please use this identifier to cite or link to this item: http://repository.unmul.ac.id/handle/123456789/8672
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAhsan, Siti Hamnah-
dc.contributor.authorSubagiyo, Lambang-
dc.date.accessioned2022-01-12T14:02:24Z-
dc.date.available2022-01-12T14:02:24Z-
dc.date.issued2011-10-15-
dc.identifier.issn1412-498X-
dc.identifier.urihttp://repository.unmul.ac.id/handle/123456789/8672-
dc.description.abstractIn this paper, performances of PV/Genset hybrid system installed at TPA Bontang Lestari has been carried out based on energy production analysis using methodology from IEA PVPS task 2. The system performance during two months are : the average of solar radiation is rather potential about 6,43 kWh/m energy generate from PV about 34,43 kWh and the energy supply from Genset about 33,60 kWh. The 2 months average performance ratio of the whole system is 40.75%. and final yield is 2,34 hours/day. This potential of the system is comparably high to the potential range of PV hybrid system.en_US
dc.language.isootheren_US
dc.relation.ispartofseriesVolume 10;Issue 2-
dc.subjectPV/Genset hybrid systemen_US
dc.subjectenergy productionen_US
dc.subjectsystem performanceen_US
dc.titleANALISIS PRODUKSI ENERGI SISTEM HIBRID PV/GENSET DI TPA BONTANG LESTARIen_US
dc.typeArticleen_US
Appears in Collections:A - Teacher Training and Education

Files in This Item:
File Description SizeFormat 
PRODUKSI ENERGI SISTEM HIBRID-(Mulawarman).pdf470.6 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.