Collection's Items (Sorted by Submit Date in Descending order): 161 to 180 of 326
| Issue Date | Title | Author(s) |
| 2022-06 | PENILAIAN RISIKO K3 PADA PENGALIRAN BBM KE TANGKI TIMBUN DENGAN MENGGUNAKAN METODE HAZOP DAN FTA | Cantika, Nadhira; Fathimahhayati, Lina; Pawitra, Theresia |
| 2022-04 | Penentuan prioritas perbaikan layanan pengiriman barang pada industri logistik | Rahayu, Andriana; Tambunan, Willy; Pawitra, Theresia; Tosungku, La ode |
| 2022-05 | Analisis Risiko Kecelakaan Kerja Dengan Metode HIRARC (Studi Kasus: CV. Jaya Makmur, Samarinda) | Khudory, Fajar; Fathimahhayati, Lina; Pawitra, Theresia |
| 2022-06-01 | The Determination of River Order Classification with ArcGIS Application | Lucia, Respati |
| 2022-06-30 | Analisis Mikrofasies Batugamping Formasi Wungkal-Gamping Jalur Padasan, Gunung Gajah, Bayat, Klaten, Jawa Tengah | Rahmawati, Diana |
| 2022-04-20 | THE EFFECT OF ROAD GRADE ON DUMP TRUCK FUEL CONSUMPTION | Hasan, Harjuni |
| 2022-04 | Penentuan prioritas perbaikan layanan pengiriman barang pada industri logistik | Ahmad, La Ode |
| 2020-05-05 | Analisis Pengendalian Biaya Dan Waktu Terhadap Proyek Konstruksi Dengan Metode Earned Value (Studi Kasus Proyek Perumahan Penajam Paser Utara). | Widayati, Rusfina |
| 2020-05-05 | Analisis Penurunan Konsolidasi Metode Preloading Dan Prefabricated Vertical Drain (PVD). | Widayati, Rusfina |
| 2021-05-05 | Perencanaan Krematorium dan Kolumbarium Modern Kota Samarinda. | Widayati, Rusfina |
| 2022-05-05 | Studi Perencanaan Struktur Alternatif Komposit Bangunan 10 Lantai Dengan Menggunakan Metode Load Resistance And Factor Design (LRFD) - Studi Kasus: Proyek Hotel Fox Harris Lite di Jalan S. Parman Kota Samarinda Kalimantan Timur. | Widayati, Rusfina |
| 2018-06-01 | PENGARUH TINGKAT GETARAN TANAH (GROUNDVIBRATION) AKIBAT PELEDAKAN AREA PT. RINJANI KARTANEGARA, KABUPATEN KUTAI KARTANEGAPROVINSI KALIMANTAN TIMUR | Ariefudin Zuhri, Mochammad; Hasan, Harjuni; Trides, Tommy |
| 2020-06-01 | EVALUASI PRODUKTIVITAS CRUSHER PADA COAL PROCESSING PLANT DI PT. BARA TABANG, KABUPATEN KUTAI KARTANEGARA, PROVINSI KALIMANTAN TIMUR | Jumsar, Jumsar; Hasan, Harjuni; Sakdillah, Sakdillah |
| 2019-06-01 | HUBUNGAN KANDUNGAN TOTAL SULPHUR TERHADAP GROSS CALORIFIC VALUE PADA BATUBARA PT. CARSURIN SAMARINDA | Muhammad Agung N, Nur; Nugroho, Windhu; Hasan, Harjuni |
| 2021-12-01 | PERENCANAAN PRODUKSI BATUBARAPIT B DI PT. PANCARAN SURYA ABADI, KECAMATAN ANGGANA DAN MUARA BADAK, KUTAI KARTANEGARA, KALIMANTAN TIMUR | Sahar, Sahar; Winarno, Agus; Umar, Hamzah; Nugroho, Windhu; Dina Devy, Shalaho; Hasan, Harjuni; Azizah, Anisah |
| 2019-12-01 | ESTIMASI SEDIMEN TOTAL DENGAN METODE SEDIMENT DELIVERY RATIO (SDR) PADA ROM AREA DI PT. BHARINTO EKATAMA, KUTAI BARAT, KALIMANTAN TIMUR | Suhadha Harta Nadi, Joko; Hasan, Harjuni; Dina Devy, Shalaho |
| 2018-12-01 | OPTIMALISASI ALAT GALI MUAT UNTUK MENCAPAI TARGET PRODUKSI BATUBARA PT. KALTIM DIAMOND COAL, KABUPATEN KUTAI KARTANEGARA, PROVINSI KALIMANTAN TIMUR | Narius, Narius; Hasan, Harjuni; Sakdillah, Sakdillah |
| 2016-12-01 | ANALISIS KEMAMPUGARUAN MASSA BATUAN BERDASARKAN METODE ROCK MASS RATING PIT S22GSB1 PT KITADIN EMBALUT SITE TENGGARONG SEBERANG KUTAI KARTANEGARA KALIMANTAN TIMUR | Tri Virgin Herman, Gerry; Hasan, Harjuni; Trides, Tommy |
| 2017-06-01 | RANCANGAN EXTEND PIT KAKAO R7 PADA PENAMBANGAN BATUBARA PT. KHOTAI MAKMUR INSAN ABADI, KABUPATEN KUTAI KARTANEGARA, PROVINSI KALIMANTAN TIMUR | Imanuel Tobak, Yauri; Hasan, Harjuni; Umar, Hamzah |
| 2017-12-01 | RENCANA MINE SEQUENCE PADA PIT SAMURANGAU SEKTOR D2 (PIT SM-D2) WUP ROTO SAMURANGAU PT. KIDECO JAYA AGUNG KABUPATEN PASER, PROVINSI KALIMANTAN TIMUR | Ismail, Muhammad; Hasan, Harjuni; Nugroho, Windhu |
Collection's Items (Sorted by Submit Date in Descending order): 161 to 180 of 326