Please use this identifier to cite or link to this item:
http://repository.unmul.ac.id/handle/123456789/11886| Title: | Perbandingan Penjadwalan Proyek dgn Metode PDM (Precedence Diagram Method) & CPM (Crithical Path Method) (Studi Kasus: Pembangunan Lanjutan Gedung SD Islamic Centre, Samarinda) |
| Authors: | Fahrian, Fahrian Haryanto, Budi Jamal, Mardewi |
| Issue Date: | 2-Nov-2021 |
| Publisher: | Prodi Teknik Sipil FT-UNMUL |
| Series/Report no.: | Vol. 5;No. 2 |
| URI: | http://repository.unmul.ac.id/handle/123456789/11886 |
| ISSN: | 2252-7613 |
| Appears in Collections: | A - Engineering |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| 6982-19869-1-SM Perbandingan Penjadwalaan Proyek dgn Metode PDM.pdf | Perbandingan Penjadwalan Proyek | 552.75 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.