Please use this identifier to cite or link to this item: http://repository.unmul.ac.id/handle/123456789/11886
Full metadata record
DC FieldValueLanguage
dc.contributor.authorFahrian, Fahrian-
dc.contributor.authorHaryanto, Budi-
dc.contributor.authorJamal, Mardewi-
dc.date.accessioned2022-01-17T03:45:08Z-
dc.date.available2022-01-17T03:45:08Z-
dc.date.issued2021-11-02-
dc.identifier.issn2252-7613-
dc.identifier.urihttp://repository.unmul.ac.id/handle/123456789/11886-
dc.language.isootheren_US
dc.publisherProdi Teknik Sipil FT-UNMULen_US
dc.relation.ispartofseriesVol. 5;No. 2-
dc.titlePerbandingan Penjadwalan Proyek dgn Metode PDM (Precedence Diagram Method) & CPM (Crithical Path Method) (Studi Kasus: Pembangunan Lanjutan Gedung SD Islamic Centre, Samarinda)en_US
dc.typeArticleen_US
Appears in Collections:A - Engineering

Files in This Item:
File Description SizeFormat 
6982-19869-1-SM Perbandingan Penjadwalaan Proyek dgn Metode PDM.pdfPerbandingan Penjadwalan Proyek552.75 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.