Please use this identifier to cite or link to this item:
http://repository.unmul.ac.id/handle/123456789/56072| Title: | Pengendalian Waktu dan Biaya dengan Metode Earned Value Analysis (Studi Kasus Rekonstruksi Jalan kabupataen Kutai Kartanegara) |
| Authors: | Sari, Dharwati P. |
| Issue Date: | 31-Aug-2023 |
| Publisher: | Rekayasa Sipil Universitas Brawijaya |
| URI: | http://repository.unmul.ac.id/handle/123456789/56072 |
| Appears in Collections: | A - Engineering |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Pengendalian Waktu dan Biaya dengan Metode Earned Value Analysis (Studi Kasus Rekonstruksi Jalan kabupataen Kutai Kartanegara).pdf | 774.01 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.