Please use this identifier to cite or link to this item:
http://repository.unmul.ac.id/handle/123456789/56072
Title: | Pengendalian Waktu dan Biaya dengan Metode Earned Value Analysis (Studi Kasus Rekonstruksi Jalan kabupataen Kutai Kartanegara) |
Authors: | Sari, Dharwati P. |
Issue Date: | 31-Aug-2023 |
Publisher: | Rekayasa Sipil Universitas Brawijaya |
URI: | http://repository.unmul.ac.id/handle/123456789/56072 |
Appears in Collections: | A - Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Pengendalian Waktu dan Biaya dengan Metode Earned Value Analysis (Studi Kasus Rekonstruksi Jalan kabupataen Kutai Kartanegara).pdf | 774.01 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.