Please use this identifier to cite or link to this item:
http://repository.unmul.ac.id/handle/123456789/5439Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Irwan, Gani | - |
| dc.date.accessioned | 2020-11-26T15:10:13Z | - |
| dc.date.available | 2020-11-26T15:10:13Z | - |
| dc.date.issued | 2020-11-20 | - |
| dc.identifier.uri | http://repository.unmul.ac.id/handle/123456789/5439 | - |
| dc.title | Reviewer Revisi Proseding Analysis of costs and emissions on the addition of production capacity of the power plant using multi echelon economic dispatch | en_US |
| Appears in Collections: | Reports | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Lampiran-7_Analysis of costs and emissions on the addition.pdf | 265.75 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.