Please use this identifier to cite or link to this item: http://repository.unmul.ac.id/handle/123456789/46382
Title: ANALISIS BIAYA PENAMBANGAN BATUBARA BERDASARKAN NISBAH PENGUPASAN PADA PT. PANCARAN SURYA ABADI KEC. MUARA BADAK KA. KUTAI KARTANEGARA KALIMANTAN TIMUR
Authors: Hasan, Harjuni
Nurfaysa
Keywords: Coal, Overburden, Cost, Production
Issue Date: 21-Nov-2022
Publisher: JOURNAL TRANSFORMATION OF MANDALIKA (JTM)
Series/Report no.: Volume 3 No .3;
Abstract: Analysis of financial statements is an important step in assessing the value of the company. This research has a goal of determining mining costs based on the stripping ratio and the amount of profit obtained from the mining plan. In this study, the author uses an applied method with a quantitative analysis approach, where research demands the use of numbers, starting from data collection, interpretation of the data, and the appearance of the results which are presented in the form of mathematical calculation results. Coal production produced in 2021 is 305,100 MT/Year and Overburden production is 1,054,815 BCM/Year, so the coal production cost is Rp. 103,900.11/MT or $ 7.27/MT and an overburden fee of Rp. 41,176.94/BCM or $2.88/BCM. Based on the Reference Coal Price in 2021, after calculating the sales of domestic and export coal, the sales income of $26,532,614.30 for a year (2021) was obtained
URI: http://repository.unmul.ac.id/handle/123456789/46382
ISSN: e-ISSN 2745-5882 p-ISSN 2962-2956
Appears in Collections:A - Engineering

Files in This Item:
File Description SizeFormat 
Jurnal Hr_Hasan and Nurfasya.pdf1.19 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.