Please use this identifier to cite or link to this item: http://repository.unmul.ac.id/handle/123456789/35617
Full metadata record
DC FieldValueLanguage
dc.contributor.authorIlham, M.-
dc.contributor.authorHasan, Harjuni-
dc.contributor.authorSakdillah, Sakdillah-
dc.date.accessioned2022-03-22T06:02:03Z-
dc.date.available2022-03-22T06:02:03Z-
dc.date.issued2019-12-01-
dc.identifier.urihttp://repository.unmul.ac.id/handle/123456789/35617-
dc.publisherJurnal Teknologi Mineral FT UNMULen_US
dc.titleUPAYA PENCAPAIAN PRODUKSI CRUSHER SEBESAR 250.000 MT/BULAN DI PT BARA KUMALA SAKTI KECAMATAN LOA KULU KABUPATEN KUTAI KARTANEGARA PROVINSI KALIMANTAN TIMURen_US
dc.title.alternativeEffort Of Crusher Target Production Achievement With Amount Of 250.000 Mt/Month In PT. Bara Kumala Sakti, Loa Kulu, Kutai Kartanegara, East Kalimantan Provinceen_US
dc.typeArticleen_US
Appears in Collections:A - Engineering

Files in This Item:
File Description SizeFormat 
2958-7803-1-PB.pdf217.64 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.