Please use this identifier to cite or link to this item: http://repository.unmul.ac.id/handle/123456789/35484
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSadewo, Hadi-
dc.contributor.authorAisyah, Aisyah-
dc.contributor.authorWicaksa, Arif-
dc.date.accessioned2022-03-21T13:50:37Z-
dc.date.available2022-03-21T13:50:37Z-
dc.date.issued2021-12-01-
dc.identifier.issn2723-0570-
dc.identifier.urihttp://repository.unmul.ac.id/handle/123456789/35484-
dc.description.abstractIran and Indonesia have signed an agreement on the electricity sector in 2016, where Iran committed to build a 5000 Megawatt (MW) Mobile Power Plant within five years as part of the Indonesian government's target to fulfill the national need of 35.000 MW by 2020. However, until the end of the cooperation span, Iran has not taken any steps for the construction of the MPP at all. The Indonesian government cannot do much considering the agreement is very depending on Iran as an investor. External and internal factors such as the United States' economic embargo towards Iran in 2018, Iran's involvement on the conflict in Yemen, and MPP technology which is still in the development stage seem to be obstacles for Iran to realize the cooperation mentioned above. Keywords: Cooperation, Iran, Indonesia, Mobile Power Plant, Obstaclesen_US
dc.publisherInterdependence Journal of International Studies (IJIS) OJS HI Fisip Unmulen_US
dc.relation.ispartofseriesVol. 2;No. 2-
dc.titleHambatan Iran Dalam Kerjasama Pembangunan MPP di Indonesiaen_US
dc.typeArticleen_US
Appears in Collections:A - Social and Political Sciences

Files in This Item:
File Description SizeFormat 
Hambatan Iran Dalam Kerjasama Pembangunan MPP di Indonesia.pdf279.84 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.