Please use this identifier to cite or link to this item: http://repository.unmul.ac.id/handle/123456789/13446
Title: Analysis of the application of the lean six sigma method to minimize waste in the plywood production process
Authors: gunawan, suwardi
Keywords: Lean six sigma, waste, DMAI, level sigma, FMEA, plywood
Issue Date: Nov-2021
Publisher: Faculty of Engineering, Universitas Sultan Ageng Tirtayasa
Series/Report no.: Teknika Jurnal Sains dan Teknologi;Vol 17 No 2
Abstract: PT. XYZ is a manufacturing company that produces plywood. The problem that this plywood company has faced is that in the plywood production process, there are still many activities classified as waste, thus disrupting productive activities. Therefore, identification of waste and the factors that cause it must be done to provide improvements so that waste in the production process can be reduced or even eliminated. Efforts that can be made to overcome the problems that occur were by using the lean six sigma method. The most influential waste in the plywood production process is overproduction with a sigma level of 0.00, waiting with a sigma level of 1.52, and defects with a sigma level of 3.85. The factors that cause waste are WIP waste overproduction, waste waiting between the process, and waste defect delamination. The recommendation for improvement for waste to minimize waste is for waste overproduction, namely making digitization forms, waste waiting, adding mini dryers and waste defects, and implementing the Kanban system
URI: http://repository.unmul.ac.id/handle/123456789/13446
ISSN: 2654-4113
Appears in Collections:A - Engineering

Files in This Item:
File Description SizeFormat 
11093-34642-1-PB.pdf745.26 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.