Please use this identifier to cite or link to this item:
http://repository.unmul.ac.id/handle/123456789/13124Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.author | Nugroho, Windhu | - |
| dc.contributor.author | Oktaviani, Revia | - |
| dc.date.accessioned | 2022-01-17T14:58:15Z | - |
| dc.date.available | 2022-01-17T14:58:15Z | - |
| dc.date.issued | 2021-07-04 | - |
| dc.identifier.uri | http://repository.unmul.ac.id/handle/123456789/13124 | - |
| dc.publisher | Kementerian Energi Dan Sumber Daya Mineral Republik Indonesia | en_US |
| dc.title | Pembentukan Tim Evaluasi Perpanjangan PKP2B Menjadi IUPK Sebagai Kelanjutan Operasi Kontrak/Perjanjian | en_US |
| Appears in Collections: | PPM - Faculty of Engineering | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| KEPMEN ESDM NO. 42.K_2021_TIM EVALUASI PKP2B.pdf | 773.18 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.