Please use this identifier to cite or link to this item: http://repository.unmul.ac.id/handle/123456789/11055
Title: Tim Evaluasi Perpanjangan PKP2B Menjadi IUPK Sebagai Kelanjutan Operasi Kontrak/Perjanjian
Other Titles: Kepmen ESDM RI No. 42.K/KP.05.04/DJB/2021
Authors: Nugroho, Windhu
Issue Date: 4-Jan-2021
Publisher: Kementerian Energi Dan Sumber Daya Mineral Republik Indonesia
URI: http://repository.unmul.ac.id/handle/123456789/11055
Appears in Collections:PPM - Faculty of Engineering

Files in This Item:
File Description SizeFormat 
SK ESDM TIM RPSW PT. KPC_2021_WINDHU .pdf773.18 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.