Search
Now showing items 1-10 of 307
Experimental Study of Perforated Concrete BlockBreakwater
(Ijens, 2014-06-10)
Perforatedconcrete block is a new form of breakwater that has similar function like coral reef and artificial breakwater, so the purpose of this research is to investigate how a perforated concrete block ...
Prototype System Water Level Reservoir untuk Pengendalian Kelebihan Air dengan Mikrokontroller Arduino Uno R3
(Universitas Hamzanwadi, 2021-12-20)
PDAM Cabang Loa Kulu masih menggunakan tongkat atau galah sebagai indikator ketinggian air di
dalam reservoir. Reservoir adalah tempat penampungan hasil produksi air bersih dari PDAM,
kelemahan dengan menggunakan tongkat ...
CONCEPTUAL STUDY OF SUBMARINE PIPELINE USING SUBMERGED FLOATING TUNNEL
(ARPN Journal of Engineering and Applied Sciences, 2016-05-09)
Standard practice of submarine pipeline installation is by laid on the seabed. The risk in pipeline construction and operation caused by the challenging seabed and environmental load has led to the invention of new ...
The Effect of Recycled HDPE Plastic Additions on Concrete Performance
(MPDE, 2021-03-05)
Experimental Study of Perforated Concrete BlockBreakwater
(Ijens, 2014-06-10)
Perforatedconcrete block is a new form of breakwater that has similar function like coral reef and artificial breakwater, so the purpose of this research is to investigate how a perforated concrete block ...
EXPERIMENTS ON SNAP FORCE IN TETHERS OF SUBMERGED FLOATING TUNNEL MODEL UNDER HYDRODYNAMIC LOADS IN CASE OF SHALLOW WATER
(ARPN Journal of Engineering and Applied Sciences, 2016-12-12)
Snap force in tether may cause fracture in the tether system or plate which connecting tether and tunnel body. In this paper, snap force in tether of Submerged Floating Tunnel (SFT) were investigated by hydrodynamic testing ...
Perencanaan Produksi Batubara Pit B di PT. Pancaran Surya Abadi, Kecamatan Anggana Dan Muara Badak, Kutai Kartanegara, Kalimantan Timur
(Prodi S1 Teknik Pertambangan, Universitas Mulawarman, 2021-12-20)
Pada perancangan tahapan penambangan, perlu diketahui jumlah volume cadangan batubara tertambang maupun volume overburden yang terdapat pada sebuah pit. Volume cadangan batubara tertambang dan volume overburden diperlukan ...