View Item 
  •   Unmul Repository Home
  • Articles
  • A - Engineering
  • View Item
  •   Unmul Repository Home
  • Articles
  • A - Engineering
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Pengendalian Waktu dan Biaya dengan Metode Earned Value Analysis (Studi Kasus Rekonstruksi Jalan kabupataen Kutai Kartanegara)

Thumbnail
View/Open
Pengendalian Waktu dan Biaya dengan Metode Earned Value Analysis (Studi Kasus Rekonstruksi Jalan kabupataen Kutai Kartanegara).pdf (774.0Kb)
Date
2023-08-31
Author
Sari, Dharwati P.
Metadata
Show full item record
URI
http://repository.unmul.ac.id/handle/123456789/56072
Collections
  • A - Engineering [316]

Repository Universitas Mulawarman copyright ©   LP3M Universitas Mulawarman
Jalan Kuaro Kotak Pos 1068
Telp. (0541) 741118
Fax. (0541) 747479 - 732870
Samarinda 75119, Kalimantan Timur, Indonesia
Contact Us | Send Feedback
 

 

Browse

All of Unmul RepositoryCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

My Account

Login

Repository Universitas Mulawarman copyright ©   LP3M Universitas Mulawarman
Jalan Kuaro Kotak Pos 1068
Telp. (0541) 741118
Fax. (0541) 747479 - 732870
Samarinda 75119, Kalimantan Timur, Indonesia
Contact Us | Send Feedback